RFI S.p.A.
Awarded to the Eteria Consortium—of which Itinera is a member—through an integrated contract issued by RFI, the project was conceived to address two key needs: first, the expansion of Catania Fontanarossa Airport, including the extension of the runway; and second, the enhancement of rail connections for both passenger and freight traffic. Connecting regions, strengthening the infrastructure network, and supporting the development of a strategic area: the Catania Hub represents one of the most significant railway projects for Sicily and Southern Italy. Construction is expected to take approximately three years, and the project focuses specifically on resolving the conflict between the railway and the new airport runway by constructing approximately 3 km of new underground track, including 915 meters of man-made tunnel and 785 meters of access trenches. The project also includes a new connection between Catania and Syracuse, crossing the Buttaceto River and providing direct links to Palermo; the construction of the new Bicocca station; and the expansion of the island’s main freight hub, Catania Aeroporto Fontanarossa Station, with the addition of a third dedicated track.
Catania, Italy