Okavango Bridge – BW

Okavango Bridge – BW

Client

Ministry of Transport & Communications - Roads Department

Description

Construction of the cable-stayed bridge over the Okavango River, 1,161 m long, consisting of two main beams 2 m high, supported by 72 cables anchored to the two main pylons 54 m high and made of truncated conical steel sections of variable diameter and thickness.

Location

Mohembo, Botswana