TELT
Lot 1 CO 3-4 of the Turin-Lyon railway is one of the main operational sections of the base tunnel on the Italian side.The contract, awarded to a binational consortium led by Itinera S.p.A. together with Spie Batignolles and Ghella S.p.A., involves the construction of the underground section between Chiomonte and Susa, in the Susa Valley. The project includes the excavation of approximately 30 km of tunnels, including the two bores of the base tunnel and related works: the Maddalena 2 adit, connecting tunnels and cross passages, the Clarea safety site, and the cut-and-cover tunnel at the eastern portal in Susa. With an estimated duration of around 94 months, the works will employ more than 700 people at peak activity. Excavation will also be carried out using two dual-mode TBMs, capable of adapting to varying geological conditions along the alignment. The project also provides for the sustainable management of approximately 2.3 million cubic metres of excavated material, to be reused across the project sites for concrete production and embankment construction.
Chiomonte (TO), Italy